Long lead-acid battery KPH75-12N – 12 V, 75 Ah – M6

€186.90 *
Available in 7 days
Long lead-acid battery KPH75-12N – 12 V, 75 Ah – M6
Long WP-KPH75-12N 12V/75Ah lead-acid battery
The maintenance-free LONG lead-acid battery WP12-75N (OEM No.: KPH75-12N) is ideal for powering security and alarm systems, emergency power supplies, medical equipment or industrial applications. The battery has a particularly long service life of 10–12 years and is protected against deep discharge (although this should be avoided). Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and is easy to install thanks to an M6 screw terminal.
Technical data:
Type: Lead
Voltage: 12V
Capacity: 75Ah
Dimensions: 260*170*202mm (LxWxH)
Weight: 24.2kg
Connection: M6 screw terminal
Service life: 10–12 years
| Weitere Spezifikationen | |
|---|---|
| Brand | Long |
| Breite | 170mm |
| Capacity | 75.000mAh |
| Height | 202mm |
| Highlights | 12 month warranty long service life with low self-discharge maintenance-free AGM technology robust housing and refined contacts |
| Kontakt | M6 internal thread |
| Length | 260mm |
| Product type | battery |
| Service life | 12 years |
| Type | lead |
| Voltage | 12V |
| Weight | 24,2kg |
Similar Products









