Skip to main content Skip to search Skip to main navigation

Long lead-acid battery KPH75-12NE – 12V 75Ah – suitable for repeated charging and discharging

Product no.: WP12-75NE | EAN: 4260201687257 | Manufacturer: Long
long service life with low self-discharge
maintenance-free AGM technology
robust housing and refined contacts
12 month warranty

Long lead-acid battery KPH75-12NE – 12V 75Ah – suitable for repeated charging and discharging

Lead-acid battery Long WP-KPH75-12NE 12V/75Ah

The maintenance-free LONG lead-acid battery WP12-75NE (OEM No.: KPH75-12NE) is suitable for a wide range of applications, such as powering security and alarm systems, emergency power supplies, medical equipment or industrial machinery. The battery has a particularly long service life of 10–12 years, is protected against deep discharge (although this should be avoided) and is cycle-resistant. Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and is easy to install thanks to an M6 screw terminal.

Technical specifications:

Type: Lead

Voltage: 12V

Capacity: 75Ah

Dimensions: 260x170x202mm (LxWxH)

Weight: 24.4kg

Connection: M6 screw terminal

Service life: 10–12 years

Compatible with the following electric wheelchairs / scooters:

ICARE models: 
- XTREME X8
- FRONTIER V6
- M1 MINI CROSSER
- OFFROAD V4
- Partner R44
- Q6 ULTRA

INVAVARE models:
- ARROW XT
- COMET
- G50
- Quantum R4000
- TDX SP2
- TOPAN

OTTIBOOK models:
- B600
- XENO

PERMOBIL models:
- C400
- M400 CORPUS 3G
- X850 CORPUS 3G

SUNRISE models:
- SALSA M2
- QUICK JIVE M

VERMEIREN models:
- CARPO 4
- FOREST 3 LIFT
- FOREST 3SU
- TRACER GT
- SQUOD SU
- NAVIX
- TIMIX

YOU Q models:
- ALEX QLASS SHORTBASE
- ALEX QLASS TRACTION
- LUCA / EQLASS

Compatible with MEYRA FRE ICHAIR MC2

Weitere Spezifikationen
Brand Long
Breite 170mm
Capacity 75.000mAh
Height 202mm
Highlights 12 month warranty
long service life with low self-discharge
maintenance-free AGM technology
robust housing and refined contacts
Kontakt M6 internal thread
Length 260mm
Product type battery
Service life 12 years
Type lead
Voltage 12V
Weight 24,4kg

Similar Products

 Long WP7-6S lead-acid battery
Lead rechargeable battery (incl. metal surcharge) Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available

Product no.: WP7-6S
€22.05 *
Long Lead-Acid Battery WP1.2-12
Long Lead-Acid Battery WP1.2-12 – 12 V, 1,2 Ah
Product no.: WP12-1200 | EAN: 4260201686885 | Manufacturer: Long

Available in 7 days

Product no.: WP12-1200
€12.08 *
Long Lead-acid Battery WP1236W
Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)
Product no.: WP1236W | EAN: 4260201687042 | Manufacturer: Long

Available in 7 days

Product no.: WP1236W
€25.85 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available

Product no.: WP12-7200-F2
€19.74 *
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.24 *
Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available

Product no.: WP12-3300
€17.33 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2 – 12V 12Ah – VDS 6.3mm contacts
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€30.98 *
Long Lead-Acid battery WP50-12NE
Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6
Product no.: WP12-50NE | EAN: 4260201686984 | Manufacturer: Long

Available in 7 days

Product no.: WP12-50NE
€125.44 *
 Long WP7-6S lead-acid battery
Lead rechargeable battery (incl. metal surcharge) Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available

Product no.: WP7-6S
€22.05 *
Long Lead-Acid Battery WP1.2-12
Long Lead-Acid Battery WP1.2-12 – 12 V, 1,2 Ah
Product no.: WP12-1200 | EAN: 4260201686885 | Manufacturer: Long

Available in 7 days

Product no.: WP12-1200
€12.08 *
Long Lead-acid Battery WP1236W
Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)
Product no.: WP1236W | EAN: 4260201687042 | Manufacturer: Long

Available in 7 days

Product no.: WP1236W
€25.85 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available

Product no.: WP12-7200-F2
€19.74 *
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.24 *
Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available

Product no.: WP12-3300
€17.33 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2 – 12V 12Ah – VDS 6.3mm contacts
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€30.98 *
Long Lead-Acid battery WP50-12NE
Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6
Product no.: WP12-50NE | EAN: 4260201686984 | Manufacturer: Long

Available in 7 days

Product no.: WP12-50NE
€125.44 *

0 of 0 reviews

Average rating of 0 out of 5 stars

Leave a review!

Share your experiences with other customers.