Skip to main content Skip to search Skip to main navigation

Long Lead-acid Battery WP0.8-12S - 12V 0.8Ah - JST connector

Product no.: WP12-800 | EAN: 4260201686533 | Manufacturer: Long
long service life with low self-discharge
maintenance-free AGM technology
robust housing and refined contacts
12 month warranty

Long Lead-acid Battery WP0.8-12S - 12V 0.8Ah - JST connector

Long lead-acid battery WP0,8-12S with JST connector

The maintenance-free LONG WP12-800 lead-acid battery (OEM no.: WP0.8-12S) is ideal for powering security and alarm systems, emergency power supplies, medical equipment or industrial applications (not VdS certified). The battery has a service life of 3–5 years and is protected against deep discharge (although this should be avoided). Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and features a JST connector.

Technical data:

Type: PB battery with JST connector

Voltage: 12V

Capacity: 800mAh

VDS: no

Dimensions: 96 x 25 x 62mm (LxWxH)

Weight: approx. 364g

OEM No.: WP0, 8-12S

Connector: JST

Technology: Lead-matt (AGM)

Weitere Spezifikationen
Brand Long
Breite 25mm
Capacity 800mAh
Height 62mm
Highlights 12 month warranty
long service life with low self-discharge
maintenance-free AGM technology
robust housing and refined contacts
Kontakt JST plug
Length 96mm
Manufacturer Long
Product type battery
Type lead
Voltage 12V
Weight 364g

Similar Products

Long Lead-acid Battery WP1236W
Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)
Product no.: WP1236W | EAN: 4260201687042 | Manufacturer: Long

Available in 7 days

Product no.: WP1236W
€25.85 *
 Long WP7-6S lead-acid battery
Lead rechargeable battery (incl. metal surcharge) Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available

Product no.: WP7-6S
€22.05 *
Long Lead-Acid Battery WP1.2-12
Long Lead-Acid Battery WP1.2-12 – 12 V, 1,2 Ah
Product no.: WP12-1200 | EAN: 4260201686885 | Manufacturer: Long

Available in 7 days

Product no.: WP12-1200
€12.08 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available

Product no.: WP12-7200-F2
€19.74 *
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.24 *
Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available

Product no.: WP12-3300
€17.33 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2 – 12V 12Ah – VDS 6.3mm contacts
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€30.98 *
Long Lead-Acid battery WP50-12NE
Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6
Product no.: WP12-50NE | EAN: 4260201686984 | Manufacturer: Long

Available in 7 days

Product no.: WP12-50NE
€125.44 *
Long Lead-acid Battery WP1236W
Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)
Product no.: WP1236W | EAN: 4260201687042 | Manufacturer: Long

Available in 7 days

Product no.: WP1236W
€25.85 *
 Long WP7-6S lead-acid battery
Lead rechargeable battery (incl. metal surcharge) Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available

Product no.: WP7-6S
€22.05 *
Long Lead-Acid Battery WP1.2-12
Long Lead-Acid Battery WP1.2-12 – 12 V, 1,2 Ah
Product no.: WP12-1200 | EAN: 4260201686885 | Manufacturer: Long

Available in 7 days

Product no.: WP12-1200
€12.08 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available

Product no.: WP12-7200-F2
€19.74 *
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.24 *
Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available

Product no.: WP12-3300
€17.33 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2 – 12V 12Ah – VDS 6.3mm contacts
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€30.98 *
Long Lead-Acid battery WP50-12NE
Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6
Product no.: WP12-50NE | EAN: 4260201686984 | Manufacturer: Long

Available in 7 days

Product no.: WP12-50NE
€125.44 *

0 of 0 reviews

Average rating of 0 out of 5 stars

Leave a review!

Share your experiences with other customers.


Skip product gallery

Alternative

Multipower MP0,8-12AMP
Multipower Lead-Acid Battery MP0.8-12AMP – 12V 0.8Ah AMP Plug
Product no.: MPB12-800 | EAN: 4260476410994

Available

Product no.: MPB12-800
€17.01 *