Skip to main content Skip to search Skip to main navigation

Long Lead-Acid battery WP22-12N - 12V 22Ah - M6 Bolt

Product no.: WP12-22N | EAN: 4260201686922 | Manufacturer: Long
long service life with low self-discharge
maintenance-free AGM technology
robust housing and refined contacts
12 month warranty

Long Lead-Acid battery WP22-12N - 12V 22Ah - M6 Bolt

PB Battery Long WP Series Standby 6V DC / 1Ah WP22-12N

The maintenance-free LONG lead-acid battery WP12-22N (OEM No.: WP22-12N) is suitable for a wide range of applications, such as powering security and alarm systems, emergency power supplies, medical equipment or industrial applications. The battery has a service life of up to 5 years and is protected against deep discharge (although this should be avoided). Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and is easy to install thanks to an M6 screw cap.

Technical data:

Type: Lead

Voltage: 12V

Capacity: 22Ah

Dimensions: 181x76x167mm (LxWxH)

Weight: 6.9kg

Connection: M6 screw terminal

Material: ABS UL94 HB

Weitere Spezifikationen
Brand Long
Breite 76mm
Capacity 22.000mAh
Height 167mm
Highlights 12 month warranty
long service life with low self-discharge
maintenance-free AGM technology
robust housing and refined contacts
Kontakt M6 internal thread
Length 181mm
Manufacturer Long
Product type battery
Type lead
Voltage 12V
Weight 6,9kg

Similar Products

Long Lead-Acid Battery WP1.2-12
Long Lead-Acid Battery WP1.2-12 – 12 V, 1,2 Ah
Product no.: WP12-1200 | EAN: 4260201686885 | Manufacturer: Long

Available in 7 days

Product no.: WP12-1200
€12.08 *
Long Lead-acid Battery WP1236W
Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)
Product no.: WP1236W | EAN: 4260201687042 | Manufacturer: Long

Available in 7 days

Product no.: WP1236W
€25.85 *
Lead rechargeable battery (incl. metal surcharge) Long WP Series Standby 6V DC / 1Ah WP7-6S
Lead rechargeable battery (incl. metal surcharge) Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available in 7 days

Product no.: WP7-6S
€22.05 *
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.24 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available in 7 days

Product no.: WP12-7200-F2
€19.74 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2 – 12V 12Ah – VDS 6.3mm contacts
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€30.98 *
Long Lead-Acid battery WP50-12NE
Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6
Product no.: WP12-50NE | EAN: 4260201686984 | Manufacturer: Long

Available in 7 days

Product no.: WP12-50NE
€125.44 *
Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available

Product no.: WP12-3300
€17.33 *
Long Lead-Acid Battery WP1.2-12
Long Lead-Acid Battery WP1.2-12 – 12 V, 1,2 Ah
Product no.: WP12-1200 | EAN: 4260201686885 | Manufacturer: Long

Available in 7 days

Product no.: WP12-1200
€12.08 *
Long Lead-acid Battery WP1236W
Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)
Product no.: WP1236W | EAN: 4260201687042 | Manufacturer: Long

Available in 7 days

Product no.: WP1236W
€25.85 *
Lead rechargeable battery (incl. metal surcharge) Long WP Series Standby 6V DC / 1Ah WP7-6S
Lead rechargeable battery (incl. metal surcharge) Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available in 7 days

Product no.: WP7-6S
€22.05 *
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.24 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available in 7 days

Product no.: WP12-7200-F2
€19.74 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2 – 12V 12Ah – VDS 6.3mm contacts
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€30.98 *
Long Lead-Acid battery WP50-12NE
Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6
Product no.: WP12-50NE | EAN: 4260201686984 | Manufacturer: Long

Available in 7 days

Product no.: WP12-50NE
€125.44 *
Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available

Product no.: WP12-3300
€17.33 *

0 of 0 reviews

Average rating of 0 out of 5 stars

Leave a review!

Share your experiences with other customers.


Skip product gallery

Customers also bought

Li-Me button cell from Panasonic, L14, CR2032
Li-Me button cell, Panasonic, CR2032, L14, 5004LC, DL2032, 3V, 0,22Ah
Product no.: CR2032P | EAN: 4260201688001

Available

Product no.: CR2032P
€0.69 *
Rechargeable NiMH battery for Kenwood TK280, TK290, FUG11B, TK380, TK480, TK481
Rechargeable NiMH battery for Kenwood TK280, TK290, FUG11B, TK380, TK480, TK481 - 7,2V/2,0Ah
Product no.: R56217MH | EAN: 4260201682047

Available

Product no.: R56217MH
€18.06 *
10 Varta batteries Micro, AAA, LR03, MN2400, 4003 Industrial Alkaline
Varta batteries Micro, AAA, LR03, MN2400, 4003 Industrial Alkaline, 1.5V
Product no.: VA2400N | EAN: 4260201686847

Available

Product no.: VA2400N
Content: 1 Stück
€0.31 *
4 Varta Mignon AA batteries, LR06, MN1500, 4006 Industrial Alkaline
Battery Varta Mignon, AA, LR06, MN1500, 4006 Industrial Alkaline - 1,5V (VE4)
Product no.: VA1500 | EAN: 4008496356553

Available

Product no.: VA1500
€0.33 *
Battery for Kenwood TK290-11B
NiMH battery for KENWOOD TK 290-11B - 7.2V / 1.6Ah (KNB-21N) with lugs
Product no.: R56221MH | EAN: 4260201682085

Available

Product no.: R56221MH
Content: 1 ST
€31.50 *
Panasonic button cell, CR2025, L12, 3V Battery
Li-Me button cell, Panasonic CR2025, DL2025, ECR2025, L12, 5003LC, 3V
Product no.: CR2025 | EAN: 4260201683907

Available

Product no.: CR2025
€0.59 *